HSEVISION
Question Bank
Documents
FAQ
Practice Mode
All Categories
All Levels
Heavy Equipment
Change Settings
Question 1 of 20
Score: 0
For tower cranes, what is an additional item that must be included in the monthly inspection beyond the standard shift inspection items?
OFFICER
A
Full disassembly of the turntable bearing.
B
Inspection of tower (mast) bolts and structural bolts for loose or dislodged condition.
C
A full functional load test.
D
Gudgeon pins for cracks, wear, and distortion.